State of the Art Logistic Platform
for #1 Fashion Group in the World
Lelystad, Netherlands
- Completion Time: 11 Months
- Year: 2018
- Figures: 145.000 m²/15.000 Steel Tn
Special Solutions developed through structural innovative design:
- BIM 3D modelling: integrated design of internal facilities & structure.
- Space maximization: suspended mezzanines allowing for more available ground-floor area.
- Development of new structural beam technology: not self-supporting warehouse.